Episode 1 · Build a real oil & gas feed in HYSYS

The design basis gives 10 MMSCFD of gas (SG 0.65), 2,000 bbl/d of oil (SG 0.82) and 1,500 bbl/d of water. HYSYS wants components, a fluid package and flows. This episode builds that feed in Aspen HYSYS V11 (Peng-Robinson, 11 pure components plus one C7+ hypothetical), tunes it until every V-100 outlet matches the basis, and checks the result against the hand calc.

Check HYSYS Hand calc
Dry separator gas 9,375 kg/h · M 18.83 · SG 0.650 · 10.00 MMSCFD 9,376 kg/h · 18.83 · 0.65 · 10.0
Gas Z / density at 12 barg, 60 °C 0.975 / 9.07 kg/m³ 0.975 / 9.07 kg/m³
Oil out 10,864 kg/h 10,864 kg/h
Water out 10,434 kg/h 10,434 kg/h
Live oil density 778 kg/m³ 820 kg/m³ (SG × 1000)
Oil actual flow 13.97 m³/h 13.25 m³/h
Water vapour in the gas 145 kg/h not in the hand calc

The lesson: live oil is hot and carries dissolved gas, so it is about 5 % lighter than SG × 1000 and takes 5.4 % more volume. Retention time is volume over flow, so the oil gets about 5 % less time in the separator than the hand calc promised. That is not conservative.

Rule: check the simulated feed against the basis in kg/h before you build anything else, and never take live oil density as SG × 1000.

Honest limit: the gas composition is a design choice, not a lab analysis; the oil is one pseudo component and the water is pure (not brine). On a real project, tune the model to a lab analysis and a separator test.

Check the basis numbers yourself with the free Design Hub calculators. Aspen HYSYS is a trademark of Aspen Technology, Inc.; Design Hub is not affiliated with AspenTech.