Course Content
Certified Process Design For Oil and gas

Full end-to-end sizing exercise: a three-phase production separator for a real-world gas-condensate stream. Gas capacity check, oil retention volume, water retention volume, vessel selection, nozzle schedule, ASME VIII wall thickness, internals specification, and purchase datasheet preparation. Use the Excel template provided.