From the Design Hub Process Design series, episode 3.
Watch the video: Heat and Mass Balance to PFD: Worked Example in 3-D (10 min, free on YouTube).
It builds on the plant from episode 1 and the vessel limits from episode 2.
The heat and mass balance (HMB) is the table every later decision reads: line sizes, the separator, the heater, the relief loads. This worked example builds it for the Design Hub Plant, a 10 MMSCFD three-phase separator plant with an inlet heater and an oil tank, and closes it at every unit.
1. Four ideas behind every HMB
- Mass in = mass out, for every unit and for the whole plant, in kg/h. Mass does not change with pressure; volume does.
- Energy: a heater’s duty is Q = ṁ·Δh. Use enthalpy, not cp·ΔT, because enthalpy includes the heat that boils liquid into gas.
- The flash: at the separator’s pressure and temperature an equation of state (here Peng-Robinson) splits the well fluid into gas, oil and water.
- The stream table: one column per stream, with pressure, temperature, mass flow per phase, actual volume, density and composition.
2. The stream table (normal case)
| No. | Stream | P, barg | T, °C | kg/h |
|---|---|---|---|---|
| 1 | Well fluid, manifold to H-100 coil 1 | 30 | 30 | 30,818 |
| 2 | H-100 coil 1 out, to choke HV-134 | 30 | 45 | 30,818 |
| 3 | Choke out, to H-100 coil 2 | 12.5 | 41.9 | 30,818 |
| 4 | H-100 out, 6″-P-1001 → SDV-100 → V-100 N1 | 12.5 | 60 | 30,818 |
| 5 | V-100 gas, N2 → PV-100 | 12.0 | 60.0 | 9,520 |
| 6 | Fuel gas to H-100 burner | — | — | 94 |
| 7 | Gas to K-100 suction (via V-110) | 12.0 | 60.0 | 9,426 |
| 8 | V-100 oil, N3 → LV-101 | 12.0 | 60.0 | 10,864 |
| 9 | Oil to T-100 after LV-101 | ≈ 0 | 60.0 | 10,864 |
| 10 | T-100 flash gas, to vent / flare | ≈ 0 | 60.0 | 130 |
| 11 | Stabilised oil, T-100 → P-101 → export | ≈ 0 | 60.0 | 10,734 |
| 12 | V-100 water, N4 → LV-102 → produced water | 12.0 | 60.0 | 10,434 |
Closure checks: streams 1–4 carry the same 30,818 kg/h through the heater and the choke. V-100: 9,520 + 10,864 + 10,434 = 30,818 kg/h. T-100: 10,864 = 130 + 10,734. Whole plant: in 30,818 = out 30,818 kg/h.
3. Where did 144 kg/h come from?
Added up by hand on a dry basis, the feed is 30,674 kg/h. The simulator, with the same basis, gives 30,818. The difference is water that leaves as vapour with the gas: about 145 kg/h of it in the gas stream; the 1 kg/h left over is rounding between a hand balance and the simulator. A dry basis never shows it, and it is the water that forms hydrates after the choke (episode 4).
The same water shows in the gas volume. Episode 1’s dry gas was 1,033.6 m³/h at the separator; the simulator’s wet gas stream is 9,520 kg/h and 1,050 m³/h actual.
4. The oil is not dead
Oil leaving the separator at 12 barg still holds gas. Flashed to atmospheric pressure in the tank (our Peng-Robinson flash, single stage at 60 °C, an upper bound), it releases 130 kg/h (111 Sm³/h) of gas with a molecular weight of 27.8: almost as heavy as air, so it does not rise away like methane. If the oil cools to 40 °C on the way, it is 107 kg/h. Live oil at 12 barg and 60 °C is 778 kg/m³, so its actual flow is 13.97 m³/h, not the 13.25 m³/h the stock-tank density gives: size retention on the live value.
To try the separator side yourself, the HSep+ separator designer (sign in) takes these flows.
5. The heater duty
Q = ṁ·Δh = 30,818 kg/h × 104.42 kJ/kg ÷ 3600 = 894 kW (388 kW in coil pass 1, 506 kW in pass 2). An earlier hand calc (cp·ΔT plus the choke) gave 786 kW: it misses the heat that boils 650 kg/h in the heater.
6. Three cases on every HMB
Normal (×1.0): 894 kW. Maximum (×1.2): 1,073 kW. Turndown (×0.30): 268 kW. The case that bites is not maximum flow: fluid arriving at 10 °C at normal flow needs 1,401 kW, 31 % more than maximum flow.
7. The red-pen mistake: balancing in m³/h
Across one choke the actual volume goes from 414 to 961 m³/h at the same 30,818 kg/h. The gas simply expands. The same gas is 11,799 Sm³/h on the basis sheet and 1,050 m³/h actual in the separator.
Rule: balance in kg/h; size in m³/h at the real pressure and temperature. Put three cases on every HMB before anyone sizes anything.
8. From HMB to PFD
The PFD shows the major equipment, the stream numbers and the main control loops, with the stream table underneath. Line sizes, every valve and every instrument belong on the P&ID. Symbols follow ISO 10628-1 plus company rules.
Streams come from the simulator cases and our Peng-Robinson tank flash, closed by hand at every unit. The plant is a teaching plant, not a real project. More tools: Design Hub Labs · courses.
Build the balance yourself
Free Lab: the NPSH calculator for the T-100 to P-101 oil stream, plus the rest of Design Hub Labs. Full course: Process Engineering Foundations for Oil & Gas EPC, first lessons free.