Lesson 3 · Heat and Mass Balance to PFD
The heat and mass balance (HMB) is the table every later decision reads: line sizes, the separator, the heater, the relief loads. This lesson builds it for the whole plant and closes it at every unit.
In this lesson
- Four ideas behind every HMB: mass balance, energy (Q = ṁ·Δh), the flash, and the stream table.
- The 12-stream table for the normal case, closed in kg/h at every unit.
- Why the oil isn’t dead: the gas it releases in the tank.
- The heater duty, and the three cases every HMB needs.
Key numbers
| Feed (simulator, wet) | 30,818 kg/h |
| V-100 in = out | 30,818 kg/h |
| Tank flash gas | 130 kg/h (111 Sm³/h), M = 27.8 |
| Heater H-100, normal | 894 kW = 30,818 kg/h × 104.42 kJ/kg |
| Cases | normal 894 · maximum 1,073 · turndown 268 kW |
| Cold arrival (10 °C), normal flow | 1,401 kW |
Why is the feed 30,818 kg/h here and 30,674 kg/h in Lesson 1? Lesson 1 adds up the feed on a dry basis. The simulator also carries the water that leaves as vapour: about 145 kg/h in the gas stream and about 3 kg/h dissolved in the oil (the last few kg/h are rounding). Oil and water flows are the same.
The worked steps
- Close the inlet: streams 1 to 4 carry the same 30,818 kg/h through the heater and the choke.
- Close V-100: gas 9,520 + oil 10,864 + water 10,434 = 30,818 kg/h.
- Close T-100: oil in 10,864 = flash gas 130 + oil out 10,734 kg/h.
- Heater duty: Q = ṁ·Δh = 30,818 × 104.42 ÷ 3600 = 894 kW. Use enthalpy, not cp·ΔT: cp·ΔT gives 786 kW and misses the heat that boils 650 kg/h.
- Run three cases (normal, maximum, turndown) before anyone sizes anything.
Red pen: the common mistake
A stream table that balances in m³/h. Across the choke, 414 m³/h go in and 961 come out: one valve seems to make 547 m³/h from nothing. It doesn’t. The mass is 30,818 kg/h on both sides; the gas just expands as the pressure drops.
Field note
Count the HMB revisions on a project, and you can predict the rework. Freeze the cases early.
Rule: Balance in kg/h. Size in m³/h at the real pressure and temperature. Put normal, maximum and turndown on every HMB before anyone sizes anything.
Practice
At turndown the plant runs at 30 % of normal flow. Using the normal-case Δh of 104.42 kJ/kg, what’s the heater duty?
Worked answer
0.30 × 30,818 kg/h × 104.42 kJ/kg ÷ 3600 = 268 kW, the same as the simulator’s turndown case (268 kW).
Quiz
- Why use Δh and not cp·ΔT for the heater?
- It’s faster
- Enthalpy includes the heat that boils liquid into gas
- cp is not known for gas
Answer
B
- Volume in a stream table doesn’t balance across a choke. Why?
- The table is wrong
- Gas expands as pressure drops; mass still balances
- Liquid is lost
Answer
B
- Normal duty is 894 kW. The maximum case is 1.2 × normal flow. The simulator’s duty is:
- 894 kW
- 1,073 kW
- 1,401 kW
Answer
B